SRCPM’s fire sprinkler system installation at Direct Healthcare Group, Caerphilly

March 7, 2025

At Steel River Cost and Project Management, we’re proud to deliver projects that exceed expectations. Our recent collaboration with Direct Healthcare Group on the installation of a fire sprinkler system at their warehouse in Caerphilly showcases our commitment to innovation, efficiency and client satisfaction.

A complex challenge

The project, spanning December 2021 to December 2024, involved the procurement and installation of a state-of-the-art fire sprinkler system. However, it quickly became evident that additional drainage and groundworks were required to manage potentially contaminated water that could be released in the event of system activation. This presented a unique challenge that demanded both strategic foresight and meticulous planning.

Our role – from start to finish

Appointed as Project Manager and Cost Manager, SRCPM supported Direct Healthcare Group from the initial stages of RIBA Stage 1 (Preparation and Briefing) through to Stage 6 (Handover and Close Out). Here’s how we made it happen:

  • Comprehensive advisory services: We guided the client through site investigations and the appointment of the Design Team, ensuring every decision was informed and effective.
  • Efficient project management: From coordinating tasks across multiple stakeholders to maintaining effective communication, we kept the project moving smoothly and on schedule.
  • Risk management expertise: Recognising the complexities involved, we implemented robust risk management processes, including the maintenance of a detailed Risk Register.
  • Cost management: Our team ensured cost estimates, value management and contract variations were thoroughly evaluated, helping the client stay on budget without compromising quality.
  • Seamless handover: We oversaw snagging processes, ensuring every detail was completed to the highest standard before finalising the project.

 

Adding value at every step

What truly sets SRCPM apart is our dedication to adding value. Throughout the construction phase, we worked closely with both the client and design team to minimise disruption. Managing multiple contractors on-site, we prioritised strong communication and proactive risk and programme management to ensure the project’s success.

A positive outcome

By the time the project concluded in November 2024, Direct Healthcare Group had a fully operational and compliant fire sprinkler system that protects their facility and aligns with the highest safety standards. This case study highlights SRCPM’s ability to manage complex, multi-faceted projects while keeping our client’s needs at the heart of everything we do.

If you need cost and project management consultancy support, we’re here to help. Using a breadth of expertise across a variety of sectors, we will keep your project on time, on budget and at the highest standard. Contact us today to discuss how we can help.

Learn more about SRC’s Cost and Project Management services here.

You may also like…

Stockton

11 Halegrove Court
Cygnet Drive
Stockton-on-Tees
TS18 3DB

t. 01642 605147
info@srconsultants.co.uk

Edinburgh

7 Dundas Street
Edinburgh
EH3 6QG

Copyright Steel River Consultants 2020
Steel River Consultants Ltd a company registered in England and Wales with company No. 07314055. VAT registration No. 997430376